300TPH Granite crushing plant in Uzbekistan
- Process Description
- The material enters the feeder from the hopper, and the waste is sieved out through the lower sieve of the purlin and the feeder. The 20-100mm material directly enters the transfer silo, and the material above 100mm enters the crumb through the feeder to perform primary crushing, and finally the sieve is obtained. 0-5-10-20mm finished material.
- Necessary Equipment
- Related Case